Toilet renovation: to start

The bathroom is a room with special terms: high humidity, humidity differences. That is why making fixes in the bathroom, you need to definitely plan the whole working process, to think about the sequence of steps to be achieved. Within the following guide, you will discover the way to start the repair in the bathroom and what sorts of work ought to be carried out with your hands. Step-by-step directions for bathroom repair

Stage 1: Establishing a plan and selecting a layout solution.

Repair in the bathroom can be of 2 types:

  • Unplanned, spontaneous, originating from the can of unexpected conditions. As an instance, in the event of a pipe burst, flooding by neighbors.
  • Planned, that is either capital or cosmetic. It requires planning, serious fiscal investment and time.

Begin repairs at the toilet is to determine the design, interior. Think through to the last detail, what will be the space, choose a color. Pastel colours are conventional, in addition to a blend of blue and blue, or cherry with beige.

Begin repairs at the bathroom is to determine the plan, interior layout. Think in detail, what will be the space, pick a color. Pastel colours are thought to be traditional, in addition to a blend of colours.

The next point is the selection of facing material. As a rule, finishing at the toilet is done with vinyl, porcelain tiles, mosaicand plastic panels. Check the pipes, if it has to be mended. If needed, pick an appropriate option. Proceed to the measuring work: measure all sides, calculate the area of the room. Based on these data, we mark the location of these plumbing fittings.

Step 2: the selection of sanitary fittings and substance for completing.

It’s crucial to recognize that the purchase price of sanitary ware simplifies the planning stage, rather than vice versa. This means that first we create a design project, create a plan, then go to the store. Another point – you should specify the size of your favorite plumbing fittings and check the plan, whether it matches.

It is crucial to realize that the purchase of plumbing fittings is preceded by a planning period, and not vice versa. This means that first we create a new design project, create a plan, then go to the store. Another one

As for stuff for completing, it’s preferable to get them immediately for the whole repair cycle, and that then you will not be distracted if something was missing. Remember about preparing the necessary tools.

Step 3: dismantling tiling and plumbing.

After all the preliminary work is completed, move on to the Start of the work process:

  • Eliminate the sink and tub from the area, even though they will not be replaced with new ones. This way, you are able to keep them clean and intact.
  • Remove the tile, cleaning after it all of surfaces: walls, ceiling, floor.
  • Remove paint from the walls, even if they had been formerly painted, since the glue solution or a fresh vsyakuhnya.ru layer of paint won’t stick to surface.

Step 4: Cost of communications: pipes, electrical wiring.

Quite frequently in an older home, you should carefully inspect and replace not just the pipes that are in the bathroom itself, but in addition the principal riser, and on occasion the interfloor plumbing. What’s it worth doing so? Old pipes at any time may give a flow, then the new repair is going to be emptied, it will call for additional investment to get rid of defects.